相关文章
友情链接

·搪玻璃反应釜正确操作方式及维护保养

搪玻璃反应釜

定期维护保养,特别是玻璃衬里,虽具一定的抗机械冲击强度,但它毕竟是一种脆性材料,苛刻的工作条件又不允许其存在任何微小缺陷。因此,这就需要定期维护,以下详细说明:    1、根据搪瓷反应釜的维护保养周期规定,每年安排维护两次,时间一般定于春节前后与大修期间。    2、每年春节前后只对搪瓷反应釜的温度计套管及进气管进行拆出检查。    3、每年大修期间除了检查温度计套管及进气管以外,还必须完成对搅拌浆、釜内壁搪瓷检查,反应釜

夹套试压,减速机换油,反应釜外部防腐,保温保冷检查。    4、带搅拌的搪瓷反应釜定期维护保养按照具体情况进行。

如有其他问题,可以致锅炉网,我们会为您做出专业的解答!

The reactor network and we look into the glass lined reactor to operate and maintenance.

For proper use and maintenance, cleaning glass lined reactor, the operation standardization, standardization, prolong the service life of the equipment, to ensure safety in production, product quality is stable, for how to correctly use glass lined reactor proposed several suggestions: 1, non percussion lined glass surface or the outer casing, the operation should be to prevent damage to the hard objects fall into the kettle in enamel surface. 2, the operation of the body as far as possible to avoid acid, alkali and other corrosive liquid contact, once the material contact should be promptly cleaned with a rag. 3, prohibit the use of water washing equipment, to avoid damage to the insulation layer. 4, the minimum temperature is less than or equal to 0 DEG C, after use should be placed as far as the water clamping sleeve, avoid the equipment damage due to freezing. 5, for the assembly of a mechanical seal of the reaction kettle, sealing parts should be kept clean. 6, the discharge case bottom plug, not the application of metal instruments available, bamboo or plastic rods, sticks gently poke. A material such as found with glass lining debris, should immediately open tank inspection, repair and.

Glass lined reactor, regular maintenance, especially glass lining, although a certain resistance to mechanical impact strength. But it is, after all, a kind of brittle material, harsh working conditions and does not allow the existence of any tiny defect. Therefore, this requires a regular maintenance, the following details: 1, according to the maintenance cycle of enamel reactor maintenance cycle, annual arrangements for maintenance two times, the time is generally scheduled for the Spring Festival before and after the overhaul. Before and after the Spring Festival every year, only 2 of the thermometer casing and the intake of enamel reactor tube demolition inspection. 3, during the annual overhaul in addition to check the thermometer casing and an air inlet pipe outside must also be completed agitator, kettle wall enamel check, reactor jacket pressure test, reducer oil, reaction kettle external anti-corrosion, insulation insulation check. 4, with the stirring of the enamel reaction kettle regular maintenance in accordance with the specific circumstances of the.